6 Valve Inline ABCO Filler Line - Gallons General Line Description: All equipment was installed new in 1996 with the exception of the "Currie" Palletizer.
The Production Line begins at the Unload Station where the plastic jugs are manually de-cased and placed on an Accumulation Table. The empty cases travel up, over, the bottle conveyor and down to a manual case Load Station next to the Case Sealer where they await the full jugs. The empty capped bottles pass through the Decapper and on to the Inline Filler, Capper / Cap Hopper and Jug Rinser. From the rinser they travel downstream through the Check Weigher, Jug Labeler and on to the Case Sealer. From the case sealer the full cases travel on to the Palletizer.
There is approximately 130 LF of case conveyor with (2) 90's and (3) inclines. The stainless bottle conveyor consist of 120 LF plus (2) 90's and (3) drives/changeovers.
The overall footprint of the line is 25' wide by 150' long.
Line Layout -
Case Conveyor |
![]() 6 Valve Inline ABCO Filler w/ Kaps All Capper |
|
List of the major equipment items:
List of Motors, Drives, Gearboxes and Pumps:
|